Project: East Manchester Academy – WC & Changing Room Refurbishment
Sector: Education
As part of the wider refurbishment programme at East Manchester Academy, Truline delivered upgrades to the school’s WC and changing room facilities.
The works focused on creating modern, durable spaces that meet the needs of students while maintaining safety, supervision and accessibility throughout the facilities.
The works included the following:
- Ceilings and stud wall construction
- Fire stopping works
- Fire door installation
- Glazed partitioning
- Changing room benches
- Structural steelwork
- Disabled access ramps
- WC cubicles and IPS systems
- Lighting installation
- Decoration
- Flooring
- HVAC installation
- Mechanical and electrical works
The project was delivered within strict programme deadlines during school holidays to ensure the facilities were ready for students returning for the new term.









